
Design and Planning
Energy Statement
An energy statement is a report submitted with a planning application that explains how a development will reduce energy use and carbon emissions. Many councils ask for one, but what they ask for varies. We arrange an energy consultant to prepare a statement that answers your council's own requirements.
What is it? An energy statement sets out the proposed building's expected energy demand and carbon emissions, the design measures that reduce them, and any low carbon or renewable technologies proposed. It shows the planning officer that the scheme meets the council's local plan policies on energy and climate change.
Do you need one? It depends on your council and the size of the scheme. Check the council's local validation list and its local plan. If an energy statement is listed, the application may not be validated without it. We can check this for you as part of the quote.
Does your project need an energy statement?
- Housing with an undecided heating system
- Use the statement process to compare practical energy options before the heating layout is fixed. Tell the consultant which choices remain open.
- Mixed-use development
- Homes and commercial space may have different operating patterns. Separate their assumptions rather than applying a housing specification to the entire building.
- Changes to an existing application
- Check whether revised glazing, roof equipment or accommodation changes the energy narrative. Give the consultant the earlier statement and a drawing change register.

Council route finder for an energy statement
How this tool decides
Planning authority / location
- Greater London Authority (Mayor of London) and the 33 London local authorities (London)
- London Borough of Barking and Dagenham (Barking and Dagenham)
- London Borough of Barnet (Barnet)
- London Borough of Bexley (Bexley)
- London Borough of Brent (Brent)
- London Borough of Bromley (Bromley)
- London Borough of Camden (Camden)
- City of London Corporation (City of London)
- London Borough of Croydon (Croydon)
- London Borough of Ealing (Ealing)
- London Borough of Enfield (Enfield)
- Royal Borough of Greenwich (Greenwich)
- London Borough of Hackney (Hackney)
- London Borough of Hammersmith and Fulham (Hammersmith and Fulham)
- London Borough of Haringey (Haringey)
- London Borough of Harrow (Harrow)
- London Borough of Havering (Havering)
- London Borough of Hillingdon (Hillingdon)
- London Borough of Hounslow (Hounslow)
- London Borough of Islington (Islington)
- Royal Borough of Kensington and Chelsea (Kensington and Chelsea)
- Royal Borough of Kingston upon Thames (Kingston upon Thames)
- London Borough of Lambeth (Lambeth)
- London Borough of Lewisham (Lewisham)
- London Borough of Merton (Merton)
- London Borough of Newham (Newham)
- London Borough of Redbridge (Redbridge)
- London Borough of Richmond upon Thames (Richmond upon Thames)
- London Borough of Southwark (Southwark)
- London Borough of Sutton (Sutton)
- London Borough of Tower Hamlets (Tower Hamlets)
- London Borough of Waltham Forest (Waltham Forest)
- Wandsworth Borough Council (Wandsworth)
- Westminster City Council (Westminster)
- Birmingham City Council (Birmingham)
- Leeds City Council (Leeds)
- Liverpool City Council (Liverpool)
- Sheffield City Council (Sheffield)
- Manchester City Council (Manchester)
- Bristol City Council (Bristol)
- Leicester City Council (Leicester)
- Coventry City Council (Coventry)
- City of Bradford Metropolitan District Council (Bradford)
- Nottingham City Council (Nottingham)
- Newcastle City Council (Newcastle upon Tyne)
- Brighton & Hove City Council (Brighton and Hove)
- Derby City Council (Derby)
- Hull City Council (Kingston upon Hull)
- Plymouth City Council (Plymouth)
- Milton Keynes City Council (Milton Keynes)
- Stoke-on-Trent City Council (Stoke-on-Trent)
- Southampton City Council (Southampton)
- West Northamptonshire Council (Northampton)
- City of Wolverhampton Council (Wolverhampton)
- Luton Borough Council (Luton)
- Portsmouth City Council (Portsmouth)
- Reading Borough Council (Reading)
- Norwich City Council (Norwich)
- Bournemouth, Christchurch and Poole Council (Bournemouth)
- Peterborough City Council (Peterborough)
- Bolton Council (Bolton)
- Swindon Borough Council (Swindon)
- Southend-on-Sea City Council (Southend-on-Sea)
- Warrington Borough Council (Warrington)
- Oxford City Council (Oxford)
- Sunderland City Council (Sunderland)
- Slough Borough Council (Slough)
- Telford & Wrekin Council (Telford)
- Cambridge City Council (Cambridge)
- Ipswich Borough Council (Ipswich)
- Blackpool Council (Blackpool)
- Middlesbrough Council (Middlesbrough)
- City of York Council (York)
- Kirklees Council (Huddersfield)
- Bournemouth, Christchurch and Poole Council (Poole)
- Watford Borough Council (Watford)
- Colchester City Council (Colchester)
- Exeter City Council (Exeter)
- Blackburn with Darwen Borough Council (Blackburn)
- Crawley Borough Council (Crawley)
- Gloucester City Council (Gloucester)
- Stockport Council (Stockport)
- Basingstoke and Deane Borough Council (Basingstoke)
- Basildon Borough Council (Basildon)
- Cheltenham Borough Council (Cheltenham)
- Gateshead Council (Gateshead)
- Worthing Borough Council (Worthing)
- Rochdale Borough Council (Rochdale)
- Oldham Council (Oldham)
- Chelmsford City Council (Chelmsford)
- Wirral Council (Birkenhead)
- Maidstone Borough Council (Maidstone)
- Medway Council (Gillingham)
- Salford City Council (Salford)
- Solihull Metropolitan Borough Council (Solihull)
- St Helens Borough Council (St Helens)
- Worcester City Council (Worcester)
- City of Lincoln Council (Lincoln)
- Sandwell Metropolitan Borough Council (West Bromwich)
- Eastbourne Borough Council (Eastbourne)
- Wakefield Council (Wakefield)
- Bedford Borough Council (Bedford)
- Another authority
Other planning authority name
Enter the location or project description.
Scheme and available SAP or SBEM evidence
Enter the location or project description.
Greater London Authority (Mayor of London) and the 33 London local authorities (London)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Barking and Dagenham (Barking and Dagenham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Barking and Dagenham
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Barnet (Barnet)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Bexley (Bexley)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Brent (Brent)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Bromley (Bromley)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Bromley
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Camden (Camden)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
City of London Corporation (City of London)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in City of London
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Croydon (Croydon)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Croydon
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Ealing (Ealing)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Enfield (Enfield)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Enfield
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Royal Borough of Greenwich (Greenwich)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Greenwich
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Hackney (Hackney)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Hackney
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Hammersmith and Fulham (Hammersmith and Fulham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Hammersmith and Fulham
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Haringey (Haringey)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Haringey
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Harrow (Harrow)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Havering (Havering)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Havering
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Hillingdon (Hillingdon)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Hillingdon
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Hounslow (Hounslow)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Hounslow
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Islington (Islington)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Islington
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Royal Borough of Kensington and Chelsea (Kensington and Chelsea)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Kensington and Chelsea
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Royal Borough of Kingston upon Thames (Kingston upon Thames)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Kingston upon Thames
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Lambeth (Lambeth)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Lambeth
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Lewisham (Lewisham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Lewisham
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Merton (Merton)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Newham (Newham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Redbridge (Redbridge)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Redbridge
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Richmond upon Thames (Richmond upon Thames)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Richmond upon Thames
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Southwark (Southwark)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Southwark
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Sutton (Sutton)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Tower Hamlets (Tower Hamlets)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Tower Hamlets
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
London Borough of Waltham Forest (Waltham Forest)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Waltham Forest
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Wandsworth Borough Council (Wandsworth)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Wandsworth
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Westminster City Council (Westminster)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Westminster
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Birmingham City Council (Birmingham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Birmingham
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Leeds City Council (Leeds)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Liverpool City Council (Liverpool)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Liverpool
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Sheffield City Council (Sheffield)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Sheffield
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Manchester City Council (Manchester)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Manchester
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Bristol City Council (Bristol)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Bristol
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Leicester City Council (Leicester)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Leicester
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Coventry City Council (Coventry)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Coventry
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
City of Bradford Metropolitan District Council (Bradford)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Bradford
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Nottingham City Council (Nottingham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Nottingham
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Newcastle City Council (Newcastle upon Tyne)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Newcastle upon Tyne
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Brighton & Hove City Council (Brighton and Hove)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Brighton and Hove
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Derby City Council (Derby)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Hull City Council (Kingston upon Hull)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Kingston upon Hull
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Plymouth City Council (Plymouth)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Plymouth
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Milton Keynes City Council (Milton Keynes)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Milton Keynes
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Stoke-on-Trent City Council (Stoke-on-Trent)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Stoke-on-Trent
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Southampton City Council (Southampton)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Southampton
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
West Northamptonshire Council (Northampton)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Northampton
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
City of Wolverhampton Council (Wolverhampton)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Wolverhampton
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Luton Borough Council (Luton)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Portsmouth City Council (Portsmouth)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Portsmouth
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Reading Borough Council (Reading)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Reading
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Norwich City Council (Norwich)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Norwich
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Bournemouth, Christchurch and Poole Council (Bournemouth)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Bournemouth
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Peterborough City Council (Peterborough)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Peterborough
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Bolton Council (Bolton)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Swindon Borough Council (Swindon)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Swindon
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Southend-on-Sea City Council (Southend-on-Sea)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Southend-on-Sea
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Warrington Borough Council (Warrington)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Warrington
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Oxford City Council (Oxford)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Sunderland City Council (Sunderland)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Sunderland
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Slough Borough Council (Slough)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Telford & Wrekin Council (Telford)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Telford
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Cambridge City Council (Cambridge)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Cambridge
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Ipswich Borough Council (Ipswich)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Ipswich
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Blackpool Council (Blackpool)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Blackpool
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Middlesbrough Council (Middlesbrough)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Middlesbrough
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
City of York Council (York)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Kirklees Council (Huddersfield)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Huddersfield
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Bournemouth, Christchurch and Poole Council (Poole)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Watford Borough Council (Watford)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Watford
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Colchester City Council (Colchester)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Colchester
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Exeter City Council (Exeter)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Blackburn with Darwen Borough Council (Blackburn)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Blackburn
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Crawley Borough Council (Crawley)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Crawley
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Gloucester City Council (Gloucester)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Gloucester
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Stockport Council (Stockport)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Stockport
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Basingstoke and Deane Borough Council (Basingstoke)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Basingstoke
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Basildon Borough Council (Basildon)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Basildon
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Cheltenham Borough Council (Cheltenham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Cheltenham
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Gateshead Council (Gateshead)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Gateshead
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Worthing Borough Council (Worthing)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Worthing
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Rochdale Borough Council (Rochdale)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Rochdale
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Oldham Council (Oldham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Chelmsford City Council (Chelmsford)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Chelmsford
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Wirral Council (Birkenhead)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Birkenhead
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Maidstone Borough Council (Maidstone)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Maidstone
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Medway Council (Gillingham)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Gillingham
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Salford City Council (Salford)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Salford
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Solihull Metropolitan Borough Council (Solihull)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Solihull
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
St Helens Borough Council (St Helens)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in St Helens
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Worcester City Council (Worcester)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Worcester
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
City of Lincoln Council (Lincoln)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Lincoln
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Sandwell Metropolitan Borough Council (West Bromwich)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in West Bromwich
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Eastbourne Borough Council (Eastbourne)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Eastbourne
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Wakefield Council (Wakefield)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Wakefield
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Bedford Borough Council (Bedford)
Check the selected authority’s validation requirements and gather the energy inputs listed below.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Building compliance in Bedford
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
Another authority
Send the exact planning authority name and its energy-information request for a project-specific scope.
Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications
Typical project: £395 to £750 per statement.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Checked November 2026.
Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.
Deadline: Confirm the submission or design deadline with the project team.
What to have ready
- Application drawings with revision references, including elevations and the roof plan.
- Accommodation schedule distinguishing homes from commercial floorspace.
- Proposed insulation, glazing, heating and hot-water specifications.
- Roof layout identifying potential solar areas and competing equipment.
- The council's energy-related pre-application comments and validation request.
How we work this out
The figures shown are indicative. They are ranges taken from prices that UK providers of this service have published, and they are here to help you budget. They are not a quote, an offer or a price guarantee from National Building Compliance.
Your actual price depends on details this tool cannot see, including the size and layout of the building, how many units there are, access, location, how complete your drawings are, and how quickly you need the work. It may be lower or higher than the range shown.
Unless a figure says otherwise, prices exclude VAT. The date each range was last checked is shown beside it.
For an accurate, fixed price, send us your project details. We will confirm the scope and quote before any work is booked.
Indicative market costs
| Case | Unit | Indicative range |
|---|---|---|
| Typical project | per statement | £395 to £750 Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project. |
Checked November 2026.
Energy Statements for typical project in England typically costs £395 to £750 per statement before VAT, based on prices published by UK providers and checked in November 2026. This is indicative and not a quote.
Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.
Information for an energy statement
- Application drawings with revision references, including elevations and the roof plan.
- Accommodation schedule distinguishing homes from commercial floorspace.
- Proposed insulation, glazing, heating and hot-water specifications.
- Roof layout identifying potential solar areas and competing equipment.
- The council's energy-related pre-application comments and validation request.
When an energy statement for planning is requested
The National Planning Policy Framework expects the planning system to support the transition to a low carbon future, and allows local plans to set policies on energy and carbon. GOV.UK planning practice guidance on climate change and on renewable and low carbon energy explains how councils can apply those policies.(Source: GOV.UK: National Planning Policy Framework; GOV.UK: Planning practice guidance, Climate change; GOV.UK: Planning practice guidance, Renewable and low carbon energy)
Planning practice guidance on making an application explains that councils can request supporting information through a local list of information requirements, where it is reasonable to do so. Each council sets its own list, so whether an energy statement is required, which schemes it applies to and what it must contain differ by council. This page does not describe any one council's policy.(Source: GOV.UK: Planning practice guidance, Making an application (local information requirements))
The applicant is responsible for submitting the statement. Any commitments made in it may be secured by planning condition, so they need to be realistic for the build.
How an energy statement is prepared
- You send the site address, drawings and a description of the scheme.
- We check the council's local plan policies and validation list for energy requirements.
- The consultant estimates the scheme's energy demand and carbon emissions, usually from SAP or SBEM modelling.
- Design measures, such as fabric and ventilation improvements, are tested to show their effect.
- Low carbon and renewable options, such as heat pumps or solar panels, are assessed for the site.
- The statement is written against each relevant policy, with the figures the council asks for.
- You receive the statement to submit with the planning application, and we answer any officer queries.
Keeping energy statement commitments buildable
Create a short decision register while the energy statement is being prepared. Record the proposed heating equipment, the roof area reserved for generation and any fabric improvements used in the calculations. Assign each item to the designer who can confirm it. This helps distinguish an agreed specification from an option that still needs investigation. Where equipment access, external appearance or electrical capacity remains uncertain, flag that uncertainty before submission. The statement should leave the delivery team with a recognisable design rather than a collection of disconnected aspirations.
Why an energy statement may attract queries
Officers most often query statements that use a generic template rather than the council's own policies, or that promise technologies the site cannot accommodate. A statement should name each relevant policy and show how the scheme meets it, with figures that match the drawings.
Changing the design after submission without updating the statement is another common problem. If the scheme changes, ask for a revised statement before the decision.
Pricing and scheduling an energy statement
The scope depends on the mix of building uses, the available energy calculations and how settled the heating proposal is. Comparing alternative specifications takes more work than describing an agreed design. Programme the statement around the next drawing issue so the consultant is not pricing or modelling superseded information.
- Price
- [[TO SUPPLY: Energy Statements price from]]
- Turnaround
- [[TO SUPPLY: Energy Statements turnaround time]]
Your an energy statement report
A planning energy statement in PDF, written to the council's policies, setting out the baseline, the reductions from design measures and technologies, and the final predicted emissions. Where a council asks for a specific template or spreadsheet, it is completed and included.
The planning officer uses the statement to check the scheme against the energy policies, and may attach conditions requiring the measures to be delivered. The same modelling can be carried forward into the Building Regulations SAP or SBEM calculations later.(Source: GOV.UK: Planning practice guidance, Making an application (local information requirements))
Comparing approaches to an energy statement
| Starting position | Useful approach | Design question |
|---|---|---|
| Concept scheme | Compare feasible energy strategies | Where can equipment fit? |
| Developed design | Reconcile calculations and specifications | Do the inputs describe the drawings? |
| Revised application | Identify affected assumptions | Which conclusions need updating? |
Questions about an energy statement
What does a planning officer expect in an energy statement?
A clear account of how the scheme meets the council's energy policies, with predicted energy use and emissions, the measures proposed and their effect. The exact content depends on the council.
Can I use an energy statement template?
A template shows the layout, but each council has different policies. A statement that does not address your council's own requirements is likely to be queried.
Is an energy statement the same as a sustainability statement?
No. An energy statement covers energy and carbon only. A sustainability statement covers wider issues such as water, materials, waste and biodiversity, and may include the energy statement.
Do small schemes need one?
Some councils ask for one on minor schemes, others only on larger developments. Check the local validation list, or ask us to check it.
How much does an energy statement cost?
It depends on the scheme. Published prices: [[TO SUPPLY: price from]]. Turnaround: [[TO SUPPLY: turnaround time]].
Is London different?
Major developments in Greater London need an energy assessment under the London Plan. See our London Plan energy assessment page.
Request a quote
Tell us about the project once. We will confirm which services apply and send a quote.
All fields marked * are required.
