National Building Compliance
Menu
English countryside house with solar panels on the roof

Design and Planning

Energy Statement

An energy statement is a report submitted with a planning application that explains how a development will reduce energy use and carbon emissions. Many councils ask for one, but what they ask for varies. We arrange an energy consultant to prepare a statement that answers your council's own requirements.

What is it? An energy statement sets out the proposed building's expected energy demand and carbon emissions, the design measures that reduce them, and any low carbon or renewable technologies proposed. It shows the planning officer that the scheme meets the council's local plan policies on energy and climate change.

Do you need one? It depends on your council and the size of the scheme. Check the council's local validation list and its local plan. If an energy statement is listed, the application may not be validated without it. We can check this for you as part of the quote.

Does your project need an energy statement?

Housing with an undecided heating system
Use the statement process to compare practical energy options before the heating layout is fixed. Tell the consultant which choices remain open.
Mixed-use development
Homes and commercial space may have different operating patterns. Separate their assumptions rather than applying a housing specification to the entire building.
Changes to an existing application
Check whether revised glazing, roof equipment or accommodation changes the energy narrative. Give the consultant the earlier statement and a drawing change register.
Aerial view of solar panels on house roofs

Council route finder for an energy statement

How this tool decides

Planning authority / location

  • Greater London Authority (Mayor of London) and the 33 London local authorities (London)
  • London Borough of Barking and Dagenham (Barking and Dagenham)
  • London Borough of Barnet (Barnet)
  • London Borough of Bexley (Bexley)
  • London Borough of Brent (Brent)
  • London Borough of Bromley (Bromley)
  • London Borough of Camden (Camden)
  • City of London Corporation (City of London)
  • London Borough of Croydon (Croydon)
  • London Borough of Ealing (Ealing)
  • London Borough of Enfield (Enfield)
  • Royal Borough of Greenwich (Greenwich)
  • London Borough of Hackney (Hackney)
  • London Borough of Hammersmith and Fulham (Hammersmith and Fulham)
  • London Borough of Haringey (Haringey)
  • London Borough of Harrow (Harrow)
  • London Borough of Havering (Havering)
  • London Borough of Hillingdon (Hillingdon)
  • London Borough of Hounslow (Hounslow)
  • London Borough of Islington (Islington)
  • Royal Borough of Kensington and Chelsea (Kensington and Chelsea)
  • Royal Borough of Kingston upon Thames (Kingston upon Thames)
  • London Borough of Lambeth (Lambeth)
  • London Borough of Lewisham (Lewisham)
  • London Borough of Merton (Merton)
  • London Borough of Newham (Newham)
  • London Borough of Redbridge (Redbridge)
  • London Borough of Richmond upon Thames (Richmond upon Thames)
  • London Borough of Southwark (Southwark)
  • London Borough of Sutton (Sutton)
  • London Borough of Tower Hamlets (Tower Hamlets)
  • London Borough of Waltham Forest (Waltham Forest)
  • Wandsworth Borough Council (Wandsworth)
  • Westminster City Council (Westminster)
  • Birmingham City Council (Birmingham)
  • Leeds City Council (Leeds)
  • Liverpool City Council (Liverpool)
  • Sheffield City Council (Sheffield)
  • Manchester City Council (Manchester)
  • Bristol City Council (Bristol)
  • Leicester City Council (Leicester)
  • Coventry City Council (Coventry)
  • City of Bradford Metropolitan District Council (Bradford)
  • Nottingham City Council (Nottingham)
  • Newcastle City Council (Newcastle upon Tyne)
  • Brighton & Hove City Council (Brighton and Hove)
  • Derby City Council (Derby)
  • Hull City Council (Kingston upon Hull)
  • Plymouth City Council (Plymouth)
  • Milton Keynes City Council (Milton Keynes)
  • Stoke-on-Trent City Council (Stoke-on-Trent)
  • Southampton City Council (Southampton)
  • West Northamptonshire Council (Northampton)
  • City of Wolverhampton Council (Wolverhampton)
  • Luton Borough Council (Luton)
  • Portsmouth City Council (Portsmouth)
  • Reading Borough Council (Reading)
  • Norwich City Council (Norwich)
  • Bournemouth, Christchurch and Poole Council (Bournemouth)
  • Peterborough City Council (Peterborough)
  • Bolton Council (Bolton)
  • Swindon Borough Council (Swindon)
  • Southend-on-Sea City Council (Southend-on-Sea)
  • Warrington Borough Council (Warrington)
  • Oxford City Council (Oxford)
  • Sunderland City Council (Sunderland)
  • Slough Borough Council (Slough)
  • Telford & Wrekin Council (Telford)
  • Cambridge City Council (Cambridge)
  • Ipswich Borough Council (Ipswich)
  • Blackpool Council (Blackpool)
  • Middlesbrough Council (Middlesbrough)
  • City of York Council (York)
  • Kirklees Council (Huddersfield)
  • Bournemouth, Christchurch and Poole Council (Poole)
  • Watford Borough Council (Watford)
  • Colchester City Council (Colchester)
  • Exeter City Council (Exeter)
  • Blackburn with Darwen Borough Council (Blackburn)
  • Crawley Borough Council (Crawley)
  • Gloucester City Council (Gloucester)
  • Stockport Council (Stockport)
  • Basingstoke and Deane Borough Council (Basingstoke)
  • Basildon Borough Council (Basildon)
  • Cheltenham Borough Council (Cheltenham)
  • Gateshead Council (Gateshead)
  • Worthing Borough Council (Worthing)
  • Rochdale Borough Council (Rochdale)
  • Oldham Council (Oldham)
  • Chelmsford City Council (Chelmsford)
  • Wirral Council (Birkenhead)
  • Maidstone Borough Council (Maidstone)
  • Medway Council (Gillingham)
  • Salford City Council (Salford)
  • Solihull Metropolitan Borough Council (Solihull)
  • St Helens Borough Council (St Helens)
  • Worcester City Council (Worcester)
  • City of Lincoln Council (Lincoln)
  • Sandwell Metropolitan Borough Council (West Bromwich)
  • Eastbourne Borough Council (Eastbourne)
  • Wakefield Council (Wakefield)
  • Bedford Borough Council (Bedford)
  • Another authority

Other planning authority name

Enter the location or project description.

Scheme and available SAP or SBEM evidence

Enter the location or project description.

Greater London Authority (Mayor of London) and the 33 London local authorities (London)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in London

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Barking and Dagenham (Barking and Dagenham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Barking and Dagenham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Barnet (Barnet)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Barnet

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Bexley (Bexley)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Bexley

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Brent (Brent)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Brent

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Bromley (Bromley)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Bromley

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Camden (Camden)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Camden

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

City of London Corporation (City of London)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in City of London

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Croydon (Croydon)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Croydon

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Ealing (Ealing)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Ealing

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Enfield (Enfield)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Enfield

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Royal Borough of Greenwich (Greenwich)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Greenwich

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Hackney (Hackney)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Hackney

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Hammersmith and Fulham (Hammersmith and Fulham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Hammersmith and Fulham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Haringey (Haringey)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Haringey

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Harrow (Harrow)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Harrow

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Havering (Havering)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Havering

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Hillingdon (Hillingdon)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Hillingdon

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Hounslow (Hounslow)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Hounslow

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Islington (Islington)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Islington

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Royal Borough of Kensington and Chelsea (Kensington and Chelsea)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Kensington and Chelsea

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Royal Borough of Kingston upon Thames (Kingston upon Thames)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Kingston upon Thames

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Lambeth (Lambeth)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Lambeth

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Lewisham (Lewisham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Lewisham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Merton (Merton)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Merton

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Newham (Newham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Newham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Redbridge (Redbridge)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Redbridge

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Richmond upon Thames (Richmond upon Thames)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Richmond upon Thames

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Southwark (Southwark)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Southwark

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Sutton (Sutton)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Sutton

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Tower Hamlets (Tower Hamlets)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Tower Hamlets

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

London Borough of Waltham Forest (Waltham Forest)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Waltham Forest

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Wandsworth Borough Council (Wandsworth)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Wandsworth

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Westminster City Council (Westminster)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Westminster

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Birmingham City Council (Birmingham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Birmingham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Leeds City Council (Leeds)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Leeds

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Liverpool City Council (Liverpool)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Liverpool

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Sheffield City Council (Sheffield)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Sheffield

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Manchester City Council (Manchester)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Manchester

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Bristol City Council (Bristol)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Bristol

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Leicester City Council (Leicester)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Leicester

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Coventry City Council (Coventry)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Coventry

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

City of Bradford Metropolitan District Council (Bradford)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Bradford

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Nottingham City Council (Nottingham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Nottingham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Newcastle City Council (Newcastle upon Tyne)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Newcastle upon Tyne

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Brighton & Hove City Council (Brighton and Hove)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Brighton and Hove

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Derby City Council (Derby)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Derby

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Hull City Council (Kingston upon Hull)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Kingston upon Hull

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Plymouth City Council (Plymouth)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Plymouth

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Milton Keynes City Council (Milton Keynes)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Milton Keynes

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Stoke-on-Trent City Council (Stoke-on-Trent)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Stoke-on-Trent

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Southampton City Council (Southampton)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Southampton

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

West Northamptonshire Council (Northampton)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Northampton

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

City of Wolverhampton Council (Wolverhampton)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Wolverhampton

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Luton Borough Council (Luton)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Luton

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Portsmouth City Council (Portsmouth)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Portsmouth

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Reading Borough Council (Reading)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Reading

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Norwich City Council (Norwich)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Norwich

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Bournemouth, Christchurch and Poole Council (Bournemouth)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Bournemouth

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Peterborough City Council (Peterborough)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Peterborough

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Bolton Council (Bolton)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Bolton

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Swindon Borough Council (Swindon)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Swindon

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Southend-on-Sea City Council (Southend-on-Sea)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Southend-on-Sea

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Warrington Borough Council (Warrington)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Warrington

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Oxford City Council (Oxford)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Oxford

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Sunderland City Council (Sunderland)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Sunderland

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Slough Borough Council (Slough)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Slough

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Telford & Wrekin Council (Telford)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Telford

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Cambridge City Council (Cambridge)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Cambridge

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Ipswich Borough Council (Ipswich)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Ipswich

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Blackpool Council (Blackpool)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Blackpool

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Middlesbrough Council (Middlesbrough)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Middlesbrough

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

City of York Council (York)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in York

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Kirklees Council (Huddersfield)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Huddersfield

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Bournemouth, Christchurch and Poole Council (Poole)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Poole

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Watford Borough Council (Watford)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Watford

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Colchester City Council (Colchester)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Colchester

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Exeter City Council (Exeter)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Exeter

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Blackburn with Darwen Borough Council (Blackburn)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Blackburn

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Crawley Borough Council (Crawley)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Crawley

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Gloucester City Council (Gloucester)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Gloucester

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Stockport Council (Stockport)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Stockport

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Basingstoke and Deane Borough Council (Basingstoke)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Basingstoke

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Basildon Borough Council (Basildon)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Basildon

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Cheltenham Borough Council (Cheltenham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Cheltenham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Gateshead Council (Gateshead)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Gateshead

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Worthing Borough Council (Worthing)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Worthing

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Rochdale Borough Council (Rochdale)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Rochdale

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Oldham Council (Oldham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Oldham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Chelmsford City Council (Chelmsford)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Chelmsford

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Wirral Council (Birkenhead)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Birkenhead

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Maidstone Borough Council (Maidstone)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Maidstone

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Medway Council (Gillingham)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Gillingham

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Salford City Council (Salford)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Salford

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Solihull Metropolitan Borough Council (Solihull)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Solihull

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

St Helens Borough Council (St Helens)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in St Helens

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Worcester City Council (Worcester)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Worcester

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

City of Lincoln Council (Lincoln)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Lincoln

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Sandwell Metropolitan Borough Council (West Bromwich)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in West Bromwich

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Eastbourne Borough Council (Eastbourne)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Eastbourne

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Wakefield Council (Wakefield)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Wakefield

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Bedford Borough Council (Bedford)

Check the selected authority’s validation requirements and gather the energy inputs listed below.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Building compliance in Bedford

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

Another authority

Send the exact planning authority name and its energy-information request for a project-specific scope.

Local requirements depend on the council validation list and local plan; this choice is not a policy determination. GOV.UK information requirements for planning applications

Typical project: £395 to £750 per statement.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Next step: Send the recorded project details and the page preparation list with your enquiry so we can confirm scope and quote.

Deadline: Confirm the submission or design deadline with the project team.

What to have ready

  • Application drawings with revision references, including elevations and the roof plan.
  • Accommodation schedule distinguishing homes from commercial floorspace.
  • Proposed insulation, glazing, heating and hot-water specifications.
  • Roof layout identifying potential solar areas and competing equipment.
  • The council's energy-related pre-application comments and validation request.
How we work this out

The figures shown are indicative. They are ranges taken from prices that UK providers of this service have published, and they are here to help you budget. They are not a quote, an offer or a price guarantee from National Building Compliance.

Your actual price depends on details this tool cannot see, including the size and layout of the building, how many units there are, access, location, how complete your drawings are, and how quickly you need the work. It may be lower or higher than the range shown.

Unless a figure says otherwise, prices exclude VAT. The date each range was last checked is shown beside it.

For an accurate, fixed price, send us your project details. We will confirm the scope and quote before any work is booked.

Indicative market costs

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project. Checked November 2026.
CaseUnitIndicative range
Typical projectper statement£395 to £750

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Checked November 2026.

Energy Statements for typical project in England typically costs £395 to £750 per statement before VAT, based on prices published by UK providers and checked in November 2026. This is indicative and not a quote.

Indicative only. This is a typical UK market range based on prices published by other providers, checked November 2026. It is not a quote. Prices exclude VAT unless stated. Contact us for an accurate price for your project.

Get an accurate price for this project

Information for an energy statement

  • Application drawings with revision references, including elevations and the roof plan.
  • Accommodation schedule distinguishing homes from commercial floorspace.
  • Proposed insulation, glazing, heating and hot-water specifications.
  • Roof layout identifying potential solar areas and competing equipment.
  • The council's energy-related pre-application comments and validation request.

How an energy statement is prepared

  1. You send the site address, drawings and a description of the scheme.
  2. We check the council's local plan policies and validation list for energy requirements.
  3. The consultant estimates the scheme's energy demand and carbon emissions, usually from SAP or SBEM modelling.
  4. Design measures, such as fabric and ventilation improvements, are tested to show their effect.
  5. Low carbon and renewable options, such as heat pumps or solar panels, are assessed for the site.
  6. The statement is written against each relevant policy, with the figures the council asks for.
  7. You receive the statement to submit with the planning application, and we answer any officer queries.
How an energy statement steps emissions down. Labels on the diagram: Carbon emissions; Baseline; After demand; reduction; After efficient; supply; After renewables:; final emissions.
Bar heights are illustrative. The statement reports the figure at each step.

Keeping energy statement commitments buildable

Create a short decision register while the energy statement is being prepared. Record the proposed heating equipment, the roof area reserved for generation and any fabric improvements used in the calculations. Assign each item to the designer who can confirm it. This helps distinguish an agreed specification from an option that still needs investigation. Where equipment access, external appearance or electrical capacity remains uncertain, flag that uncertainty before submission. The statement should leave the delivery team with a recognisable design rather than a collection of disconnected aspirations.

Why an energy statement may attract queries

Officers most often query statements that use a generic template rather than the council's own policies, or that promise technologies the site cannot accommodate. A statement should name each relevant policy and show how the scheme meets it, with figures that match the drawings.

Changing the design after submission without updating the statement is another common problem. If the scheme changes, ask for a revised statement before the decision.

Pricing and scheduling an energy statement

The scope depends on the mix of building uses, the available energy calculations and how settled the heating proposal is. Comparing alternative specifications takes more work than describing an agreed design. Programme the statement around the next drawing issue so the consultant is not pricing or modelling superseded information.

Price
[[TO SUPPLY: Energy Statements price from]]
Turnaround
[[TO SUPPLY: Energy Statements turnaround time]]

Your an energy statement report

A planning energy statement in PDF, written to the council's policies, setting out the baseline, the reductions from design measures and technologies, and the final predicted emissions. Where a council asks for a specific template or spreadsheet, it is completed and included.

The planning officer uses the statement to check the scheme against the energy policies, and may attach conditions requiring the measures to be delivered. The same modelling can be carried forward into the Building Regulations SAP or SBEM calculations later.(Source: GOV.UK: Planning practice guidance, Making an application (local information requirements))

Comparing approaches to an energy statement

Starting positionUseful approachDesign question
Concept schemeCompare feasible energy strategiesWhere can equipment fit?
Developed designReconcile calculations and specificationsDo the inputs describe the drawings?
Revised applicationIdentify affected assumptionsWhich conclusions need updating?

Questions about an energy statement

What does a planning officer expect in an energy statement?

A clear account of how the scheme meets the council's energy policies, with predicted energy use and emissions, the measures proposed and their effect. The exact content depends on the council.

Can I use an energy statement template?

A template shows the layout, but each council has different policies. A statement that does not address your council's own requirements is likely to be queried.

Is an energy statement the same as a sustainability statement?

No. An energy statement covers energy and carbon only. A sustainability statement covers wider issues such as water, materials, waste and biodiversity, and may include the energy statement.

Do small schemes need one?

Some councils ask for one on minor schemes, others only on larger developments. Check the local validation list, or ask us to check it.

How much does an energy statement cost?

It depends on the scheme. Published prices: [[TO SUPPLY: price from]]. Turnaround: [[TO SUPPLY: turnaround time]].

Is London different?

Major developments in Greater London need an energy assessment under the London Plan. See our London Plan energy assessment page.

Request a quote

Tell us about the project once. We will confirm which services apply and send a quote.

All fields marked * are required.