National Building Compliance
Menu
Modern towers and a construction crane in central London

London

Building Compliance in City of London

City of London Corporation handles planning applications and provides the City’s statutory building control service. We arrange accredited assessors for City of London office developments, commercial refurbishments and alterations, coordinating the assessment scope with the project’s planning and building control requirements.

Local information last checked:

City of London validation: match the report to the proposal

The Corporation’s validation checklist page, updated 9 June 2025, links to the Full Validation Checklist dated February 2016. Its separate major-applications guidance explains that substantial refurbishments, extensions and changes of use can fall within major applications. Agree the submission scope against the actual works rather than treating an office refurbishment as automatically minor.

The major-applications guidance says supporting documents depend on the development and should be discussed with the Environment Department. For a City office scheme, assemble a report schedule before commissioning individual assessments: the energy model, sustainability narrative and plant proposals need to describe the same design. The entries below distinguish the published checklist from that additional guidance.

City requirementPublished scopePractical assessment brief
Sustainable development and climate change reportThe February 2016 checklist lists new buildings, major extensions and removal or variation of a condition, including minor material alterations.Use a sustainability statement to explain the proposed sustainability standard and carbon reduction measures. Identify retained structure and changed services so the evidence reflects the actual works.
Energy statementThe major-applications guidance asks for predicted demand, carbon savings and performance against energy efficiency standards and reduction targets.Commission an energy statement with a clear baseline and proposed specification. For non-domestic modelling, agree where SBEM calculations support the submission rather than assuming a building regulations calculation alone answers planning.
Sustainability statement and pre-assessmentThe major-applications guidance includes sustainable design and construction through demolition, construction and long-term management, with a BREEAM or housing pre-assessment.For a commercial City scheme, coordinate the BREEAM pre-assessment with the sustainability statement. Establish who supplies each item of evidence, and do not describe a supporting statement as a BREEAM certificate.
Noise and pollution reportThe major-applications guidance calls for effects on surrounding occupiers, pollution arising from the development and proposed responses.Scope commercial and industrial noise surveys around the proposed equipment and affected neighbours. Resolve mitigation before plant locations and enclosures are fixed.

The Square Mile alongside the London Plan 2021

The City’s Local Plan 2015 policy DM15.1 expressly links major-development energy statements to London Plan requirements. Read that local requirement alongside London Plan 2021, policy SI2, which calls for a detailed energy strategy for major development following the energy hierarchy, including monitoring and reporting. A City submission therefore needs a planning energy narrative, not just an end-of-design compliance result.

For City office proposals, London Plan 2021 policy SI2 starts with reducing demand before efficient supply and on-site renewables. Use London Plan energy assessments to organise the design evidence in that sequence. Keep assumptions about occupancy, servicing and the landlord’s systems consistent across the energy strategy and the commercial model, and identify which measures remain within the applicant’s control.

Services in City of London

New homes and conversions

Commercial and public buildings

Existing buildings and refurbishment

Planning applications

City Local Plan: BREEAM, heat resilience and neighbours

The City of London Local Plan, adopted 15 January 2015, policy CS15, says major development should aim for BREEAM Excellent or Outstanding and favours reuse of buildings or their main structures. DM15.1 requires sustainability statements with all planning applications and specifies pre-assessment, energy and climate-resilience evidence for major development, including refurbishment. For an office upgrade, record the retained fabric and proposed improvements rather than presenting the scheme as an entirely new building.

Policy DM15.5 in the 2015 Local Plan requires major development to demonstrate resilience to predicted lifetime climate conditions and seeks to minimise heat retention and waste heat discharge. This makes the cooling approach part of the sustainability case. Use overheating assessments to test relevant spaces and design options, with occupancy and equipment gains that reflect the proposed office use rather than a convenient default.

Under Local Plan policy DM15.7, development must consider its noise effects and provide an assessment where appropriate, including protection for noise-sensitive neighbours. For a City plant replacement, combine acoustic evidence with the cooling design: a quieter enclosure that changes airflow must not be assessed independently of the mechanical specification. Acoustic design can turn survey findings into coordinated mitigation.

The Corporation’s sustainability guidance, updated 19 December 2025, identifies the Planning for Sustainability SPD adopted 19 February 2025. It covers retrofit and reuse, energy, circular economy, climate resilience and urban greening. It also describes City Plan 2040 as emerging. Structure the project’s sustainability statement around the relevant topics, while keeping adopted policy, supplementary guidance and emerging policy clearly labelled.

City of London approvals for commercial alterations

The Corporation’s building control service page, updated 7 October 2026, describes pre-application advice, formal approval, inspections and completion certification, including fit-outs and restoration work. For a City commercial alteration, agree the evidence and inspection stages before closing up altered construction. Planning reports and building control evidence serve different decisions, so keep their scope and document status distinct.

Building compliance questions in City of London

Does a City of London office refurbishment need sustainability evidence?

Local Plan policy DM15.1 includes refurbishment within its major-development requirements. Confirm whether the works are major, then align the sustainability statement, pre-assessment and energy evidence with that scope.

Which authority deals with City of London building control?

The City of London Corporation’s service provides statutory building control within the City, including advice and inspections. Confirm the applicable approval route for the particular building before commissioning the technical package.

Is City Plan 2040 treated here as adopted policy?

No. The Corporation’s sustainability requirements page calls it emerging and says it should be considered in proposals. This page distinguishes it from the Local Plan 2015 and the adopted February 2025 sustainability SPD.

Request a quote

Tell us about the project once. We will confirm which services apply and send a quote.

All fields marked * are required.