Building compliance for architects

Design-stage calculations and reports that support your drawings and planning submissions.

Architects: define the assessment brief at concept stage

Turn the initial compliance discussion into a usable consultant brief. The most useful starting point is a coordinated account of the proposal, its constraints and the decisions still open to change.

  • Identify building uses, retained elements and the proposed construction route. Distinguish design assumptions from client decisions so an assessor can flag dependencies without treating every option as settled.
  • Provide orientation, room uses, elevations and sections alongside plans. Highlight constrained openings, sensitive neighbours and fixed plant positions rather than expecting each assessor to infer them independently.
  • Set out report recipients and submission milestones. Identify which evidence supports planning, which informs technical design and which depends on the completed works.
  • Name the lead designer for responses and establish a revision convention. A short change note can prevent an assessment continuing against an obsolete drawing set.
Architectural studio workspace with design plans on the wall

Architects: coordinate evidence through design and delivery

Project stageAssessment interfaceDesign action
Concept and planningPlanning requirements differ by council. Planning application guidance explains the information framework; an energy statement or noise survey should answer the local brief.Agree the submission scope before commissioning. Record where planning assumptions constrain later choices about layout, servicing or external appearance.
Developed designSAP calculations follow the domestic method described in SAP guidance. Non-domestic work may require SBEM calculations under the National Calculation Methodology.Issue coordinated fabric and services information. Resolve contradictory specifications before asking for a final calculation, especially where different consultants own related inputs.
Technical designApproved Document E provides sound-insulation guidance. Acoustic design can inform separating construction and junctions before installation.Coordinate structure, services penetrations and finishes. Make responsibility for junction details explicit rather than leaving each trade to interpret a generic performance note.
Construction and completionApproved Document F provides ventilation guidance. Ventilation testing links the installed system to measured performance evidence.Track substitutions and site queries through to assessment revisions. Reserve time for findings to return to the design team before the final evidence schedule is closed.

Architects: resolve connected design questions together

Fabric, energy and moisture

A fabric specification can affect several assessments. U-value calculations, thermal bridging calculations and condensation risk analysis answer different questions. Define the build-up, junction geometry and environmental assumptions consistently so their outputs can be compared meaningfully.

Approved Document L addresses energy efficiency, while Approved Document C includes moisture guidance. Keep the evidence for each purpose identifiable. One calculation should not be presented as resolving every aspect of a construction detail.

Glazing, heat and ventilation

Assess comfort while openings, shading and room arrangements remain negotiable. Approved Document O provides guidance for new residential buildings. Start with overheating assessments to establish the appropriate route for the proposal.

Where thermal modelling is appropriate, scope it through TM59 and TM52 assessments. Distinguish modelling inputs from the design solution that will actually be delivered. If opening windows are an assessment assumption, make any practical constraints visible to the assessor rather than leaving them outside the brief.

Architects: appoint a coordinated assessment contact

The New Build Compliance package brings the main assessment and testing conversations into a shared scope. It can cover relevant calculations and site evidence without transferring design ownership away from the project team. Agree deliverables, information inputs and exclusions before relying on the package in the consultant schedule.

National Building Compliance acts as a single contact for building-project tests, calculations and reports in England. We arrange accredited, qualified assessors and coordinate evidence intended for Building Control and planning officers to accept first time. You brief the project once, then technical questions can be directed to the person best placed to answer them.

Architects: guides for briefing and review

Set the right assessment question

Architects: make assessment assumptions visible at handover

Include the final assessment register in the information passed to the delivery team. Show which drawing issues each report uses and highlight assumptions requiring site confirmation. Where a contractor proposes an alternative detail, ask for its effect on related assessments to be checked before treating the substitution as agreed. This gives the client a traceable account of the design evidence without asking them to interpret separate consultant files.

Architects: questions about consultant interfaces

Can you review an early design with incomplete specifications?

Yes, provided provisional inputs are clearly identified. Agree which questions the early assessment should answer and which decisions must be confirmed before a final report is issued.

Who owns changes suggested by an assessment?

The project team should agree design responsibility. An assessor can explain findings and assessment assumptions; the appointed designer needs to coordinate any resulting design amendment.

Can one model support every submission?

Do not assume that it can. Different reports have different purposes and inputs. Confirm whether information can be reused and record any changes in assumptions between assessments.

How should we issue revisions?

Send a revised drawing register with a concise account of the changes. Identify affected specifications and ask which outputs need updating before circulating older reports with new drawings.