We arrange accredited assessors for new housing, conversions, commercial premises and rented buildings in Havering, covered by the London Borough of Havering. Start with the application route and the evidence your particular site needs.

Local information last checked:

Havering’s planning and building control routes

The London Borough of Havering planning service handles planning applications, while the council’s Building Control service offers full plans, building notices, site visits and regularisation applications. Keep planning reports separate from the evidence needed to demonstrate Building Regulations compliance. For a new dwelling, an energy strategy submitted for planning does not replace the detailed specification and calculations needed as the design develops.

Havering describes its full plans route as suitable for larger, more complex projects. For a conversion or mixed-use scheme, establish which drawings and calculations will be reviewed before work starts. Coordinate SAP calculations for dwellings or SBEM calculations for non-domestic areas with the construction specification, rather than leaving energy modelling until products have been ordered.

Services in Havering

New homes and conversions

Commercial and public buildings

Existing buildings and refurbishment

Planning applications

Havering’s checklist: energy, noise and extraction

Havering’s Checklist 004, linked from its validation checklists, requires an energy statement, strategy or assessment for all major development proposals. It also lists a Sustainable Design and Construction Statement for all major proposals, including climate-change mitigation details and BREEAM targets where applicable. Commission an energy statement and sustainability statement against the same drawings so that fabric, servicing and environmental commitments agree.

The Havering checklist asks for a noise and vibration impact assessment where proposals raise disturbance issues for adjoining occupiers, are noise sensitive or lie in noise-sensitive areas. Its examples include new housing adjoining a trunk road, motorway or railway, and major residential development in designated town centres. A road and rail noise survey can inform glazing and ventilation choices before layouts become fixed. The checklist calls for background assessment over a 24-hour period, predicted levels and mitigation, not simply a proposed glazing specification.

For food preparation or service premises, and other schemes with substantial external ventilation or extraction equipment, Checklist 004 requires a ventilation/extraction statement addressing equipment position, screening, odour treatment and acoustic characteristics. Agree the plant arrangement before commissioning acoustic design. This is planning evidence about the installation and its effects, not the same deliverable as post-installation ventilation testing.

Havering Policy 36 alongside the London Plan 2021

Policy 36 of the Havering Local Plan 2016–2031, adopted November 2021 requires major proposals to demonstrate the London Plan’s carbon-reduction targets through a detailed energy assessment. It also provides for a contribution to the council’s Carbon Reduction Fund for a shortfall. The borough policy therefore sits alongside, rather than replaces, the strategic requirements of the London Plan, March 2021. Our London Plan Energy Assessments service can help organise the energy hierarchy evidence and identify unresolved design choices before submission.

For Havering major schemes, London Plan Policy SI 4 requires the energy strategy to show how internal overheating and reliance on air conditioning will be reduced through its cooling hierarchy. Test orientation, shading, glazing and ventilation together through overheating assessments. Where Havering’s noise checklist also applies, do not assume windows can remain open without considering the acoustic implications.

For new Havering homes, London Plan Policy SI 5 sets a mains-water consumption target of 105 litres or less per person per day, excluding the allowance for external water use. Use water calculations to check the actual fittings schedule against that planning target. Agree taps, showers and sanitaryware early enough that procurement changes can be checked rather than silently altering the submitted assumptions.

Rainham and Beam Park: heat networks and amenity

The supporting text to Havering’s Policy 36 identifies Rainham and Beam Park Strategic Development Area as a potential district-heating opportunity and says proposals should seek connection to existing or planned decentralised networks. A developer here should investigate the network position before settling the heating strategy. Record the connection assumptions and any feasibility constraints in the energy assessment rather than treating a stand-alone heating system as the automatic starting point.

Havering’s Policy 34, Managing pollution addresses noise, odour, vibration and other pollution, and calls for design, layout and orientation to minimise exposure. Read this alongside the heating proposals in Rainham and Beam Park: plant location and neighbouring uses matter as well as modelled carbon savings. A noise survey and coordinated acoustic advice can help test whether the selected equipment arrangement protects nearby occupiers.

Havering rental licensing from March 2026

Havering’s current licensing page lists selective licensing in Beam Park, Harold Wood, Rainham and Wennington, Rush Green and Crowlands, Squirrels Heath, St Albans and St Edwards from 18 March 2026 to 17 March 2031. Check the property’s ward rather than relying on its postal town. For a landlord acquiring several homes, separate the address-based licensing check from the building’s safety and energy records.

The council’s 18 March 2026 announcement confirms borough-wide additional licensing for homes rented to three or four unrelated people sharing amenities. Its licensing page describes mandatory licensing for five or more people from two or more households sharing facilities. Review the occupancy arrangement before choosing the licence route. Alongside that review, establish the scope of any fire risk assessment, EPC and legionella risk assessment needed for the property; these are separate checks, not substitutes for a Havering licence.

Building compliance questions in Havering

Does Havering require an energy statement for every extension?

Checklist 004 gives the energy-assessment trigger as all major development proposals. Do not apply that trigger automatically to every domestic extension; establish the application category and any site-specific requirements first.

Does selective licensing cover every Havering ward?

No. Havering’s licensing page lists seven wards for the 2026–2031 selective scheme. Additional HMO licensing applies across the borough, so the tenancy arrangement also matters.

Why check noise before choosing windows for Havering housing?

Havering’s checklist specifically includes new housing adjoining trunk roads, motorways or railway land among noise-assessment examples. Establish external noise and mitigation needs before fixing glazing and ventilation specifications.