National Building Compliance
Menu
Two colleagues talking through questions in a meeting

Building compliance FAQs

Answers to the questions clients ask most often.

Using these building compliance FAQs

These questions cover choosing a service, preparing information and understanding the evidence produced. They concern projects in England. Start with the topic closest to your building, then follow the linked service or guide for the scope of work and the information an assessor will need.

A drawing, certificate and site test answer different questions. Tell us whether you are developing a design, changing an existing building or collecting completion evidence. Include any written request from your project team so the proposed appointment addresses the actual issue rather than a similar-sounding service.

Building compliance FAQs by topic

Choosing and arranging services

Where can I get help with an existing job or report?

Existing customers should email support@nationalbuildingcompliance.co.uk. Add the project reference, site address and report title where you have them, so we can identify the work you mean. For a new project enquiry, use the contact page.

What information should I send first?

Send the address, building use, drawings, project stage and any report request. Explain what has already been commissioned; the new build checklist helps you organise the evidence without assuming every project needs the same appointments.

Can I arrange several assessments together?

Yes. Share the whole project brief so appointments can be coordinated around access and design readiness. The SAP calculations service is a useful starting point for discussing dwelling energy work alongside related site testing.

What affects the price of an air test?

Building size, layout, location, access and the number of tests influence the scope. Send drawings and your proposed programme rather than relying on a headline allowance. The air test cost guide explains the information needed for a quotation.

Can you help with a conversion into flats?

Share existing and proposed plans, including separating floors, walls and building services. Conversion work can involve several distinct assessments; the flat conversion checklist helps identify questions to resolve before finishes conceal the construction.

Energy calculations and certificates

Is a SAP calculation the same as an EPC?

A SAP calculation models dwelling energy performance, while an EPC presents an energy rating and related information. They are connected but serve different purposes. See the SAP and EPC comparison before commissioning one in place of the other.

Should I ask for SAP or SBEM?

Start with the proposed building use and any separate residential and commercial areas. Mixed-use projects need careful scoping rather than a single assumption for the whole building. The SAP versus SBEM guide explains the distinction.

What does a BRUKL report show?

It records outputs from a non-domestic energy compliance model, including the design inputs and comparison results. Check that its revision matches the specification being built. The BRUKL report guide explains how to read it alongside supporting calculations.

Do product substitutions affect energy calculations?

They can. Changes to glazing, insulation, heating or ventilation may alter modelled performance, even where products appear similar. Send revised specifications to the SAP calculations service before treating an earlier calculation as evidence for the changed design.

How does a DEC differ from an EPC?

A DEC describes operational energy performance using consumption information; an EPC describes calculated performance using building characteristics. Choosing between them starts with the purpose of the request. See the DEC versus EPC guide for the practical differences.

Can I commission an extension calculation from photographs?

Photographs help explain the existing building but rarely describe every construction layer or opening accurately. Provide measured drawings and specifications where available. The extension calculations guide explains why the proposed work needs its own assessment scope.

Fabric, ventilation and comfort

When should I prepare for an air tightness test?

Plan while construction details remain accessible, then confirm that the envelope and service penetrations are ready before testing. Temporary masking should be agreed with the assessor. Use the air test preparation guide to brief your site team.

Does ventilation testing include designing the system?

Testing checks installed airflow and records results against the agreed assessment scope. Design concerns system selection, routes and intended performance. Share the design information when arranging ventilation testing so missing inputs are identified before the visit.

What should be ready for MVHR commissioning?

The installed system should be accessible, with relevant design information and equipment instructions available. Explain any unfinished rooms or controls before booking. MVHR commissioning concerns setting up and checking the system rather than simply switching the unit on.

Are U-values and thermal bridges the same thing?

A U-value describes heat transfer through an element such as a wall. Thermal bridging concerns local heat flow around junctions and interruptions. The thermal bridging calculations service explains why junction details need attention alongside insulation thickness.

Will adding insulation remove condensation risk?

The outcome depends on the construction, moisture conditions and ventilation. A changed build-up can move colder surfaces or alter drying behaviour. Arrange condensation risk analysis using the proposed layers rather than assuming additional insulation resolves every moisture issue.

Which overheating assessment should I request?

Send the building use, layouts, glazing and ventilation proposals first. Approved Document O describes assessment routes within its scope. The simplified method guide helps frame the discussion without assuming the simpler route suits every design.

Can water calculations use provisional fittings?

An initial assessment can use an identified proposed specification, but the calculation needs checking against the selected fittings. Keep product information for taps, showers and sanitaryware together. The water calculations service explains the inputs needed to assess the design.

Acoustics and planning

Is a noise survey the same as a sound insulation test?

A noise survey investigates sound affecting a site or receiver. Sound insulation testing measures how completed separating constructions perform. Use the sound insulation testing service when your question concerns transmission between spaces rather than environmental noise.

Can floor finishes affect acoustic testing?

Yes. Finishes and floor build-ups influence the test arrangement and sound transmission, so describe what is installed and what remains outstanding. Consult the sound test preparation guide before agreeing a visit or changing the tested construction.

What information helps scope a heat pump noise assessment?

Provide the unit model, acoustic data, location, nearby windows and operating assumptions. Planning requirements differ by council, so include any officer correspondence. The heat pump noise guide explains why equipment selection and siting should be considered together.

Can a road noise survey inform bedroom design?

Survey findings can help the design team consider glazing, ventilation and room arrangement together. Explain how windows are expected to operate. The road and rail noise service addresses transport sources rather than treating every external noise as interchangeable.

What should I send for an energy statement?

Send the planning brief, drawings, proposed energy strategy and any council correspondence. Planning requirements differ by council; the energy statement guide helps organise a project-specific response instead of recycling a statement prepared for another development.

Can a nightclub assessment use only daytime observations?

The assessment should address representative activity, operating hours and affected neighbours. Music, customer movements and associated equipment may need separate consideration. Discuss the proposed operation with the entertainment noise service before deciding what observations will answer the question.

Existing buildings and safety

Which asbestos survey suits planned refurbishment?

Describe exactly where work will disturb the building. HSE survey guidance distinguishes management surveys from refurbishment or demolition surveys. The refurbishment survey service helps define the affected areas and access arrangements.

Can a purchase survey cover future alterations?

A purchase brief and a defined refurbishment brief can involve different access and investigation. Explain both intentions before commissioning, including any seller restrictions. The pre-purchase asbestos survey service helps establish what the proposed inspection will and will not cover.

Does a legionella assessment always involve sampling?

Sampling and risk assessment are different activities. HSE landlord guidance explains that routine sampling is not usually required in domestic hot and cold water systems. The landlord assessment guide explains the wider assessment context.

What should I prepare for a fire risk assessment?

Collect building plans, previous assessments, maintenance records and information about occupancy and management. Explain known access restrictions in advance. The fire risk assessment service helps scope the appointment around the premises rather than a generic building description.

Does a smoke shaft inspection replace a fire risk assessment?

The appointments answer different questions. A smoke control inspection considers the system within its agreed scope, while a fire risk assessment considers broader premises risks. Share existing records when arranging smoke shaft and AOV testing so findings can inform building management.

What happens during a retrofit assessment?

The assessor gathers information about the dwelling, its condition, occupancy and energy characteristics to inform proposed improvements. Access and existing records help explain how the home operates. The retrofit assessment guide describes how to prepare for that visit.