Birmingham City Council handles local planning applications, with requirements set out in its local information list. This guide is for new housing, mixed-use schemes, commercial buildings and residential conversions in Birmingham. National Building Compliance arranges assessors and supporting reports for these projects.

Local information last checked:

Birmingham growth areas: Greater Icknield and Longbridge

The Birmingham Development Plan, adopted January 2017 names Greater Icknield as growth area GA2 and Longbridge as GA10. These are plan designations, not claims that every site remains available. For a scheme in either area, establish the site-specific planning position before deciding which technical reports to commission. A growth allocation does not replace the evidence needed for an individual application.

Policy GA2 identifies Icknield Port Loop, City Hospital and Spring Hill/Dudley Road among Greater Icknield’s development sites. The adopted allocation combines housing with commercial, community and employment uses. That mixture makes the relationship between future homes and neighbouring activities an early design issue. Use noise surveys to establish constraints before fixing bedroom positions or assuming that open windows will provide a suitable ventilation strategy.

The same GA2 allocation identifies the listed engine house, boiler house and chimney at Severn Trent Waterworks for retention and sensitive integration. Where a proposal reuses retained fabric, investigate actual wall and roof build-ups before setting energy assumptions. U-value calculations can support the assessment of retained elements; they do not settle the separate question of whether an alteration is acceptable in heritage terms.

Birmingham validation: major schemes and noise-sensitive uses

The council’s Local Information Requirements for Planning Applications, December 2021 lists both an Energy Statement and a Sustainable Construction Statement for all planning applications for major development. The energy evidence should explain predicted demand and the contribution from low and zero carbon generation. Commission energy statements while heating systems, roof layouts and building fabric can still change, rather than treating the report as a final administrative attachment.

The same validation list expects sustainable construction evidence to cover overheating, water conservation, materials, waste, adaptability and biodiversity. A sustainability statement should draw these strands together and refer to the relevant specialist evidence. Where cooling risk needs investigation, overheating assessments can test the proposed design. The list does not mean that every Birmingham application automatically needs a separate overheating model.

Birmingham’s noise validation entry covers applications raising disturbance issues and noise-sensitive development. Examples include residential conversions, new homes on major roads or near licensed premises, and B2 or B8 commercial development beside existing housing. It also says that mitigation recommendations should appear in the submitted plans. Scope the survey around the actual neighbouring uses and operating periods, then keep the report, elevations and ventilation proposals consistent.

Services in Birmingham

New homes and conversions

Commercial and public buildings

Existing buildings and refurbishment

Planning applications

Birmingham TP3 and TP4: separate the policy tests

The council’s June 2025 sustainable construction and energy guidance explains policies TP3 and TP4 of the Birmingham Development Plan. It allows separate statements, a combined statement, or relevant material within a Design and Access Statement. Combining documents can reduce repetition, but each policy question still needs an identifiable answer and supporting calculations.

TP3 applies to all new development, while the guidance ties statement submission to major applications. It asks how design minimises overheating and conserves water. Water calculations can substantiate proposed fittings and consumption assumptions. Do not present a water calculation as a substitute for drainage or flood-risk evidence, which the guidance treats as separate supporting information.

Under TP4 guidance, new development should incorporate low and zero carbon generation or connect to a network where one exists, subject to the stated viability provisions. An energy-efficient envelope alone does not remove that policy issue. SAP calculations for homes and SBEM calculations for non-domestic buildings can inform the energy strategy, but the planning statement must also explain the generation or network approach.

Birmingham DM6: connect acoustic findings to the design

The Development Management in Birmingham document, December 2021 sets out policy DM6 on noise and vibration. It addresses both development generating noise and sensitive uses exposed to existing sources. For a conversion beside an operating business, assess the existing activity rather than relying only on a description of the proposed residential use. Acoustic design can translate survey findings into envelope and internal separation proposals.

DM6 requires assessments to address relevant existing, proposed and future noise and vibration sources around sensitive development. This makes an early check of surrounding uses worthwhile before commissioning measurements. Agree the assessment scope, then record how the chosen layout and mitigation respond. Keep planning noise evidence distinct from sound insulation testing, which checks completed separating constructions rather than the wider environmental exposure.

Birmingham Building Consultancy and the approval route

Birmingham City Council’s Building Consultancy page states that its Building Consultancy services are provided by Acivico (Building Consultancy) Ltd and directs applicants to that organisation’s forms. Confirm the appropriate building-control route before submission. Keep the planning energy strategy aligned with the specification used for building-regulations calculations, so that changes to insulation, glazing or heating do not leave two conflicting versions of the Birmingham scheme.

Building compliance questions in Birmingham

Does a major Birmingham application need separate energy and sustainability documents?

The June 2025 council guidance allows separate statements, a combined Sustainable Construction and Energy Statement, or coverage in the Design and Access Statement. The required evidence still needs to be clear.

Does Birmingham require noise evidence for residential conversions?

The December 2021 validation list includes conversion of buildings to residential use among proposals needing noise impact and mitigation evidence. Investigate the surrounding sources before specifying glazing and ventilation.

Who provides Birmingham City Council’s Building Consultancy service?

The council’s own page names Acivico (Building Consultancy) Ltd as its provider. Planning submission requirements remain available through Birmingham City Council’s planning service.