National Building Compliance
Menu
Busy London street with cars and buses

London

Building Compliance in Lewisham

Lewisham is covered by the London Borough of Lewisham. Its planning service handles proposals from conversions to new development. We arrange accredited assessors for developers, architects, builders and landlords, with reports scoped around the borough’s published requirements.

Local information last checked:

Lewisham growth nodes and regeneration proposals

The Lewisham Local Plan 2020–2040 directs growth towards seven Growth Nodes: Forest Hill, New Cross, Lee Green, Bellingham, Evelyn, Grove Park and Surrey Canal. It relates the scale of growth to local character and infrastructure capacity. For a development within one of these nodes, establish the energy, overheating and acoustic evidence together before fixing massing. A growth designation does not remove the need to explain how the proposed accommodation will perform.

The adopted spatial strategy also identifies the New Cross/Lewisham/Catford and Deptford Creek/Greenwich Riverside Opportunity Areas. It describes opportunities through industrial-site intensification and town-centre renewal. Where a Lewisham proposal brings homes close to retained employment uses, noise surveys can inform window and ventilation design. Carry those constraints into overheating assessments, rather than assuming occupants can always open windows for cooling.

Lewisham validation evidence and the published checklists

Lewisham’s validation page says missing information can prevent validation and lead to an application being returned. It also advertises a consultation on revised requirements ending 29 September 2026. The linked checklists therefore need checking against any subsequently adopted replacement when submitting. Do not treat the consultation wording alone as confirmation that a new list has taken effect.

The published major-development checklist marks its Energy, Sustainability and Over Heating Statement entry as applying to all applications within that checklist. It calls for an energy strategy, domestic SAP or non-domestic National Calculation Method calculations, and evidence on matters including energy, water, materials and waste. Scope energy statements and sustainability statements as coordinated evidence, while keeping their different purposes clear. This major-checklist wording is not a claim that every householder application needs the same package.

Both the minor-application checklist and major checklist require noise and vibration evidence where noise-sensitive uses are near noise-generating uses, or proposals involve noise-generating systems or plant. The minor list also asks for a ventilation/extraction statement where that equipment is proposed. For a flat conversion or commercial alteration, identify equipment positions, neighbouring receptors and operating assumptions before commissioning acoustic design. A drawing of an extract outlet alone does not address its noise effects.

Services in Lewisham

New homes and conversions

Commercial and public buildings

Existing buildings and refurbishment

Planning applications

Lewisham’s adopted sustainable design policies

The council adopted the Lewisham Local Plan on 16 July 2025, replacing its Core Strategy, Site Allocations, Development Management and Lewisham Town Centre plans. Under Policy SD2, development proposals must provide a proportionate Sustainable Design Statement covering construction and operation. Major proposals should coordinate it with detailed evidence on energy, heat risk, air quality, water and other topics. Use the adopted policy references in the report schedule rather than relying on superseded policy numbers.

Policy SD3 requires major development to be net zero-carbon, with an Energy Strategy explaining the approach as part of the Sustainable Design Statement. It provides for contributions where the target cannot be met on site. For Lewisham applicants, compare fabric and building-services options before calculating any remaining shortfall. SAP calculations or SBEM calculations support the relevant building model, but the planning narrative must also explain the design decisions.

Policies SD5 and SD10 address heat and water respectively. SD5 requires new development to reduce overheating and reliance on air conditioning through the London Plan cooling hierarchy, with major schemes providing an Energy Statement. SD10 requires water-efficient design and compliance with London Plan water standards. Coordinate shading, ventilation and fittings early: water calculations should reflect the proposed specification, while thermal modelling should use a ventilation strategy the design can actually deliver.

Lewisham reports alongside the London Plan 2021

Lewisham’s adoption page says its plan forms the statutory Development Plan together with the London Plan and Neighbourhood Plans. Read the London Plan 2021 alongside the borough requirements, not instead of them. Our London Plan energy assessments can be scoped around that combined framework. Locally, Policy QD7 requires mitigation of noise and other nuisances and applies the Agent of Change principle, so an energy strategy should not depend on ventilation assumptions that conflict with acoustic mitigation.

Lewisham shared-house licensing checks

Lewisham’s HMO licensing guidance identifies mandatory licensing for properties with five or more people in more than one household sharing amenities. Its additional scheme began on 5 April 2022 and covers qualifying HMOs outside mandatory licensing, including three or four unrelated sharers, subject to exclusions. Review actual occupation and shared facilities before assuming a smaller Lewisham rental property is outside licensing.

The same Lewisham guidance says licensed properties must comply with licensing standards and licence holders with licence conditions. Treat fire risk assessments, EPCs and legionella risk assessments as separate checks to scope around the building and its use. This is not a claim that every licence application requires all three documents; establish the applicable conditions before ordering evidence.

Lewisham building control and construction evidence

Lewisham’s building control service provides application, inspection and application-search routes, and says owners must ensure inspections happen at the relevant key stages. For a Lewisham new build or conversion, agree the construction evidence schedule alongside those inspections. Air tightness testing and sound insulation testing, where applicable, serve a different purpose from the planning energy and noise reports discussed above.

Building compliance questions in Lewisham

Which council handles Lewisham planning applications?

The London Borough of Lewisham provides the planning service. Its separate building control pages provide approval and inspection routes. Keep the two evidence schedules distinct.

Does Lewisham require sustainable design evidence?

Yes. Policy SD2 of the adopted Local Plan requires a Sustainable Design Statement proportionate to the proposal. Major schemes should coordinate it with their other detailed environmental statements.

Can a three-person Lewisham HMO need a licence?

Yes. Lewisham’s additional licensing guidance includes qualifying properties with three or four unrelated people sharing facilities. Check the published exclusions and actual occupation rather than relying on the mandatory five-person threshold.

Request a quote

Tell us about the project once. We will confirm which services apply and send a quote.

All fields marked * are required.