Services in Leicester
Testing and Inspection
- Air tightness testing in Leicester
On-site testing that measures how much air leaks through a building's envelope, with a certificate for Building Control.
- Sound insulation testing in Leicester
Pre-completion testing of separating walls and floors between homes, reported in the form Building Control expects.
- Ventilation testing in Leicester
Airflow measurement of extract fans and ventilation systems, recorded for the Building Control completion file.
- Asbestos surveys in Leicester
Surveys that find and record asbestos-containing materials, and explain which survey type a building needs.
- Management asbestos survey in Leicester
A survey of the accessible parts of an occupied building so the dutyholder can manage asbestos during normal use.
- Refurbishment and demolition survey in Leicester
An intrusive survey of the areas affected by planned refurbishment or demolition, carried out before work starts.
- Pre-purchase asbestos survey in Leicester
An asbestos survey arranged before buying a property, so the buyer knows what is present and where.
- Retrofit assessments in Leicester
A whole-house assessment of a home's condition and energy use, used to plan retrofit measures.
- Smoke shaft and AOV testing in Leicester
Testing of smoke shafts and automatic opening vents to confirm they operate as designed.
- Borescope inspections in Leicester
Camera inspection of cavities and voids through small holes, without opening up the structure.
- Legionella risk assessments in Leicester
An assessment of a building's water systems that identifies legionella risk and the controls needed.
- MVHR commissioning in Leicester
Setting up and measuring a mechanical ventilation with heat recovery system, with commissioning records for handover.
- Fire risk assessments in Leicester
A written assessment of fire risk in a building's common or work areas, with the actions needed to reduce it.
Energy and Calculations
- SAP calculations in Leicester
The energy calculation for new homes and conversions, from design stage figures to the as-built result.
- SBEM calculations in Leicester
The energy calculation for new and altered non-domestic buildings, with the BRUKL output Building Control asks for.
- U-value calculations in Leicester
Calculated U-values for walls, floors and roofs, set out in a document Building Control can check against the limits.
- EPC in Leicester
Energy Performance Certificates for homes and commercial buildings that are built, sold or let.
- Display energy certificates in Leicester
Display Energy Certificates showing the actual energy use of public buildings, with the advisory report.
- Water calculations in Leicester
The water efficiency calculation for new homes, showing estimated daily use per person against the target.
- Condensation risk analysis in Leicester
Analysis of how moisture moves through a wall, roof or floor build-up, showing whether condensation risk is acceptable.
- Home energy model in Leicester
Assessment under the Home Energy Model, the government's planned replacement for SAP.
- Thermal bridging calculations in Leicester
Calculated psi-values for junctions, replacing default values in SAP and SBEM with measured detail.
- Background ventilation calculations in Leicester
Calculations that size trickle vents and background ventilation for each room, ready for Building Control.
- Overheating assessments in Leicester
Overheating assessment for new homes, using the simplified method where it applies.
Design and Planning
- Energy statements in Leicester
Energy statements written for planning applications, setting out how a scheme meets the council's energy policy.
- Acoustic design in Leicester
Acoustic design advice from the early stages of a project, so construction details meet sound requirements.
- Party wall and ceiling design in Leicester
Design review of separating wall constructions between homes, so they are built to pass sound testing.
- Party floor design in Leicester
Design review of separating floor constructions between flats, so they are built to pass sound testing.
- CIBSE TM59 and TM52 assessments in Leicester
Dynamic thermal modelling of overheating risk, assessed against CIBSE TM59 for homes and TM52 for other buildings.
- Sustainability statements in Leicester
Sustainability statements for planning applications, covering the topics the council's policies ask for.
- Noise surveys in Leicester
Noise impact assessment for planning applications, and the starting point for the specific noise surveys below.
- Environmental noise survey in Leicester
Measurement of existing noise levels at a site, used to inform design and planning submissions.
- Residential noise surveys in Leicester
Noise assessment for new homes, showing that internal and external noise levels will be acceptable.
- Commercial and industrial noise surveys in Leicester
Assessment of sound from commercial and industrial sources under BS 4142.
- Road and rail noise surveys in Leicester
Assessment of road and railway noise affecting a proposed development.
- Entertainment and night club noise surveys in Leicester
Noise assessment for bars, clubs and venues, and for homes planned near them.
- Regulation 25A reports in Leicester
The report on high-efficiency alternative energy systems required for new buildings under Regulation 25A.
Leicester validation: sustainability and noise evidence
Leicester’s Local Validation List, dated 7 July 2025, requires a Sustainability Design and Construction Statement for all major planning applications. It covers energy efficiency, resources, waste, reuse and climate resilience. A sustainability statement should therefore explain the design decisions and reference the drawings, rather than simply collect product specifications. Agree who supplies drainage, materials and refuse-storage information before assembling the submission.
The Leicester checklists distinguish noise generated by a proposal from existing noise affecting it. For residential development they identify a Noise Impact Assessment for noisy non-residential uses within mixed-use schemes, and a Noise Level Assessment where existing noise may affect the development. Scope noise surveys around that distinction: a commercial source assessment and an assessment of future residents’ exposure answer different questions.
Leicester’s noise report guidance asks for mitigation and equipment noise data, and says noise mitigation should be considered alongside ventilation, air quality and appearance. Coordinate acoustic design with window and ventilation choices. A drawing that relies on open windows for cooling should not contradict the assumptions used to protect bedrooms from external noise. The same list says supporting reports should be no more than 12 months old, so check older evidence before resubmission.
Leicester’s adopted carbon, overheating and water policies
The council identifies the Leicester Local Plan 2020 to 2036 as adopted in June 2026. Use that adopted plan when preparing the policy response, rather than treating the July 2025 validation document as the complete policy position. The validation list describes the submission package; the adopted policies explain what the proposals and evidence must demonstrate.
Policy CCFR02 requires an Energy Statement for all major development. Other proposals may submit one or address the relevant policy areas in a Design and Access Statement. The statement must report energy demand reduction, overheating prevention, low and zero carbon technologies and savings through the energy hierarchy. Commission energy statements while layout, fabric and heating options remain open, with SAP calculations or SBEM calculations supporting the relevant building model.
Policy CCFR01 prioritises passive design, reduced fabric heat loss, control of solar gain and airtightness before further energy measures. It states minimum carbon reductions of 10% for new residential and 20% for new non-residential development against Part L 2013 through passive, fabric and efficient design, but requires higher national targets where applicable. Do not mistake that historical baseline for permission to use superseded regulations. Confirm the applicable comparison and methodology when setting the assessment brief.
The same CCFR01 policy sets a maximum water use of 110 litres per person per day for new residential development and maximum BREEAM Wat 01 credits, or equivalent best practice, for new non-domestic development. Fix sanitary fittings and flow rates early enough for water calculations to inform procurement. Its overheating requirement also supports early overheating assessments, so shading and ventilation remain design options rather than late additions.
Policy CCFR03 requires all major developments to apply low-carbon heating and cooling hierarchies. Its supporting text expects connection to existing district heat networks, with evidence where connection is not possible. Certain developments near network priority zones must allow future connection where current connection is not feasible or viable. Resolve that position before finalising plant space and the energy model, rather than assuming an individual heating system will satisfy the policy.
Leicester building control is a separate approval route
Leicester City Council’s building control guidance confirms that it enforces building regulations in the city and distinguishes these from planning permission. Listed examples needing approval include changes of use, insulation upgrades and conversions of lofts, garages or outbuildings. For a Leicester conversion, establish both routes at the start: planning noise evidence does not replace construction-stage sound insulation testing, and a planning energy statement is not itself the finished building’s compliance evidence.
Leicester selective licensing covers parts of five wards
The council’s selective licensing page names parts of Braunstone Park and Rowley Fields, Fosse, Westcotes, Stoneygate and Saffron. It applies to rented properties within the designated areas, including small HMOs as described on that page. Check the individual address against the council’s linked map; a ward name alone does not establish that every property in the ward needs this licence.
Leicester’s licence-holder responsibilities include fire safety, gas and electrical certification, repairs and property management. The council also specifies linked, mains-connected fire detection and alarm systems. Arrange a fire risk assessment around the actual layout and occupation, and keep the resulting actions with the management records. Do not treat a selective licence as a substitute for checking planning or building regulations requirements for conversion work.
Leicester heritage constraints shape retrofit choices
The adopted plan’s heritage chapter records 25 conservation areas and Policy HE01 expects proposals affecting heritage assets to explain their significance and setting. It also balances listed-building alterations against climate-change objectives. For insulation or window changes, use retrofit assessments and U-value calculations to compare feasible fabric improvements before settling on external details. Energy benefits should be presented alongside the heritage response, not as a replacement for it.
Building compliance questions in Leicester
Does every Leicester application need a separate Energy Statement?
No. Policy CCFR02 requires one for major development, while other proposals can use an Energy Statement or a relevant Design and Access Statement section. Check the application type and policy scope before choosing the document format.
What water target does Leicester’s adopted plan set for new homes?
Policy CCFR01 specifies a maximum of 110 litres per person per day. Base the calculation on the proposed fittings, and revisit it if specifications change during procurement.
Is selective licensing citywide in Leicester?
No. The council’s selective licensing guidance identifies designated parts of five wards. Use its linked map to check the property rather than assuming that the scheme covers all Leicester rentals.
Guides
Request a quote
Tell us about the project once. We will confirm which services apply and send a quote.