Areas we cover
Building Compliance in Nottingham
Local information last checked:
Nottingham validation: match the report to the proposal
The council’s Full/Outline Planning Application and Approval of Reserved Matters checklist identifies energy, noise and ventilation evidence separately. It also allows requirements to be combined in one document if the application reference identifies where each answer appears. Use that flexibility to avoid conflicting assumptions across drawings and reports, rather than leaving a required topic unaddressed.
The published Nottingham checklist still uses older use-class labels, including A3, A4, A5 and D2. Describe the actual activity and ask the planning officer how those entries apply to your proposal today. Do not assume that a changed use-class label removes the need to assess extraction or noise.
| Evidence | Published Nottingham trigger | Practical response |
|---|---|---|
| Energy statement | All major developments. | Commission an energy statement while fabric, heating and renewable-energy options can still influence the design. Keep its area schedule consistent with the planning drawings. |
| Noise assessment | Industrial and warehouse proposals in B2/B8; entertainment and drinking uses under the checklist’s older labels; new homes beside main roads or railways. | Use noise surveys to establish exposure, then acoustic design to explain mitigation. A report for traffic-exposed bedrooms needs a different scope from one assessing outgoing venue noise. |
| Ventilation/extraction statement | Erection or change of use to activities listed under A3, A4, A5, B1, B2 and B8. | Show the proposed extraction arrangement alongside noise-sensitive rooms. Do not substitute a completion-stage ventilation test for the planning statement: the two answer different questions. |
Source: Source: Application Validation Checklist: Full/Outline and Reserved Matters. No revision date is stated in the extracted checklist.
Nottingham rental licensing: occupancy and address both matter
Nottingham City Council publishes three landlord licensing schemes: mandatory, additional and selective. Mandatory licensing covers HMOs occupied by five or more people forming two or more households who share or lack toilet, cooking or personal-hygiene facilities, anywhere in the city. Additional licensing covers the corresponding shared-facility arrangement from three people in two or more households within an additional-licensing area. Establish occupancy and the address before choosing the application route.
The council says its second selective licensing scheme began on 1 December 2023. It describes selective licensing as covering most private rented properties within the scheme, including homes occupied by one or two tenants or a family, and explains that flats can be included. This is not a reason to treat every city address as designated. Check the property against the council’s area information before assuming it falls within the scheme.
Under Nottingham’s licensing guidance, licences belong to individual properties and cannot transfer between properties or people. A purchaser therefore needs to address licensing separately from the previous owner’s paperwork. For a rental acquisition, organise the EPC, any relevant fire risk assessment and legionella risk assessment around the building’s actual layout and use. These services do not replace a licence application or establish that every assessment is a universal licensing attachment.
Nottingham’s adopted plans, carbon guidance and water target
The council’s adopted Local Plan page confirms that the Nottingham City Aligned Core Strategy was adopted on 8 September 2014 and the Land and Planning Policies Document, or LAPP, on 13 January 2020. It names the wider Greater Nottingham context and says the ACS was jointly prepared with Broxtowe and Gedling. Use these adopted documents together rather than treating a joint-plan review as an adopted replacement.
Nottingham and Broxtowe’s Reduction of Carbon in New Development SPD was adopted on 17 June 2025. Nottingham says it is a material consideration for applications registered from that date. Its focus is energy and carbon reduction alongside sustainable construction. Structure an energy statement and sustainability statement so that design choices answer those subjects, not just Building Regulations calculations.
| LAPP policy | Nottingham requirement | Design implication |
|---|---|---|
| CC1: Sustainable Design and Construction | Non-domestic development of at least 1,000 square metres should achieve BREEAM Very Good where technically feasible and viable; the council seeks Excellent where feasible and viable. | Identify the assessment strategy early. SBEM calculations provide energy evidence but are not a BREEAM assessment. |
| CC1: domestic water | New dwellings should meet 110 litres per person per day, subject to viability. | Prepare water calculations using specified fittings. Record changes to taps, showers and baths before the final schedule is agreed. |
| IN2: pollution and noise | Noise-sensitive development in noisy locations needs satisfactory mitigation through design, layout and insulation. | Coordinate façade and room-layout decisions with the acoustic design. Do not rely on a generic glazing note to demonstrate site-specific mitigation. |
Source: Source: Nottingham City Land and Planning Policies, Local Plan Part 2, January 2020. The water-consumption target sits in CC1, not CC3.
Services in Nottingham
New homes and conversions
- Air tightness testing in Nottingham
- Sound insulation testing in Nottingham
- Ventilation testing in Nottingham
- MVHR commissioning in Nottingham
- SAP calculations in Nottingham
- Home energy model in Nottingham
- U-value calculations in Nottingham
- Thermal bridging calculations in Nottingham
- Condensation risk analysis in Nottingham
- Water calculations in Nottingham
- Background ventilation calculations in Nottingham
- Overheating assessments in Nottingham
- CIBSE TM59 and TM52 assessments in Nottingham
- Party wall and ceiling design in Nottingham
- Party floor design in Nottingham
- Regulation 25A reports in Nottingham
Commercial and public buildings
Existing buildings and refurbishment
Nottingham building control: agree the route before work starts
The council’s building control guide distinguishes Full Plans, Building Notice and regularisation applications, and explains that different arrangements apply with a Registered Building Control Approver or the Building Safety Regulator. Full Plans allows plans to be assessed before work progresses; a Building Notice does not provide formal plan approval. Choose the appropriate route before relying on a submission as permission to proceed.
Nottingham’s process guide also separates notice of starting work from booking inspections. Build the evidence schedule around that distinction. For relevant residential work, arrange SAP calculations early enough to inform construction, and agree when air tightness testing or sound insulation testing is needed. The project’s requirements determine the tests; submitting a planning energy statement does not by itself close the building control process.
Building compliance questions in Nottingham
Does every Nottingham application need an energy statement?
No blanket requirement is stated in the published checklist. Its energy-statement entry applies to all major developments. Check the proposal’s scale and any written pre-application advice before commissioning the report.
Is Nottingham selective licensing limited to shared houses?
No. The council’s selective licensing page includes properties occupied by one or two tenants or a family, and says flats can be included. Address and scheme coverage still need checking.
Which Nottingham policy sets the domestic water target?
LAPP Policy CC1 sets the 110 litres per person per day target for new dwellings, subject to viability. Use the proposed sanitary fittings to demonstrate the calculation rather than a standard specification unrelated to the design.